Where things stand.

Team Lipi landed at O&M 2026 and completed the WHY–WHAT–HOW architecture. Six pillars, each with a lead. The Project Elevate teams are building. Halfway along, and moving.

Signals and metrics from the January 2026 review

The one date

Baseline: January 2026.

How to read it

Form, not color.

Every state on this page reads from its outline. No traffic lights.

  • Done Filled. Done and standing.
  • Moving Outlined. Under way, not finished.
  • Waiting Dashed. Owed, or not started.
  • Broke Terracotta outline. Exists, but not connected.
Initiatives

Three initiatives.

How each layer of the architecture is holding.

  1. Why

    Project ONE

    Established

    Six pillars defined, each with a lead. The Foundation Document is complete. The vision of 'one digital language' is clear.

  2. What

    Team Lipi

    Introduced

    Introduced at O&M 2026. Concept document, implementation roadmap and all frameworks are done. Pilot team selection and first sessions are next.

  3. How

    Project Elevate

    Active

    Teams are experimenting with AI tools and building. The learning mindset is forming, but direction on what to build is missing. That's Team Lipi's job.

Pillars

Pillar signals.

Honest states in words, not percentages — as of the January 2026 review.

  1. 01

    ONE Data

    Progress

    New software feeds into Spine. Teams are thinking through data integration.

  2. 02

    ONE Process

    Some progress

    The AND Team runs workflow automation through its Project Elevate stack. ClickUp–Spine integration exists.

  3. 03

    ONE View

    Exists but disconnected

    Tableau dashboards exist but aren't centrally connected.

  4. 04

    ONE Voice

    Trainings happened

    ChatGPT training has happened, but unified digital thinking isn't embedded yet.

  5. 05

    ONE List

    Movement

    Project Hyperlink is one example. More coordination needed.

  6. 06

    ONE Earth

    Slowest

    Global urgency around AI adoption has crowded out sustainability.

Key win

Project Hyperlink

An AI-powered compliance framework (GMP Online) linking every law and guideline to specific Venus SOPs. Presented at Automa+ Vienna 2025 as an industry first. The cultural impact showed in a successful RBI audit.

Next

The pilot, step by step.

The Team Lipi pilot in three movements, from the first session to the final call. All of it owed, so all of it dashed.

  1. 01

    Start

    • Finalize Team Lipi pilot participants
    • Schedule first Team Lipi session
    • Select first department focus area
  2. 02

    Build

    • Conduct first 2–3 Team Lipi sessions
    • Produce initial workflow audit
    • Identify top automation opportunities
    • Begin first quarterly roadmap
  3. 03

    Evaluate

    • Complete Team Lipi pilot (8 sessions)
    • Produce first quarterly roadmap
    • Hand requirements to Project Elevate
    • Evaluate pilot success
    • Decide: continue, pivot, or discontinue
Metrics

Metrics to track.

Team Lipi pilot metrics: January 2026 baseline and target
Metric Baseline · January 2026 Target
Team Lipi sessions held 0 8
Quarterly roadmaps produced 0 1
Requirements handed to Project Elevate 0 3–5
Tools being built Several (ad hoc) 2+ (from roadmap)
Team Lipi attendance rate N/A 80%+